This post was originally published on this site.Minnova (TSXV: MCI; US-OTC: AGRDF) outlined a C$76.2-million ($53.4-million) plan to bring Manitoba’s PL gold mine back into production in 2028, using existing infrastructure to limit upfront spending. The operation near Sherridon, roughly 630 km northwest of Winnipeg, would average 62,200 oz. annually over 10 years, according to...
![[Aggregator] Downloaded image for imported item #24223 Tech giants come knocking for a piece of Anglo American as copper scarcity bites, Wanblad tells FT](https://thecryptopotato.com/wp-content/uploads/2026/10/anglo-teck-shares-since-merger-october-15-2026-1024x576-1-360x360.jpg)